Use the original compound scope for grade sourcing and molding trials. Use the newly submitted Nylon Plastic service scope when the requirement includes tooling or finished parts, and agree the contracting entity, approved drawing, material formulation and inspection responsibilities before production.
- Part and environment
- Drawing, wall thickness, load, temperature, moisture/chemical exposure and current failure mode.
- Material target
- Base resin, reinforcement, colour, flame rating if required, regulatory and customer specifications.
- Trial and approval
- Current grade TDS, sample quantity, drying conditions, molding trial and required test reports.
- Supply programme
- Annual demand, batch sizes, packaging, traceability, destination and delivery schedule.
- If buying tooling or parts
- CAD/drawing revision, critical dimensions, surface finish, annual volume, tool ownership, samples, first-article records and change-control requirements.