Megawa is relevant when the mounting-system purchase includes a real discussion of site geometry and engineering deliverables. Compare the producing entity, named system and agreed structural scope together; brand history, certification logos and a generic load statement do not settle those project decisions.
- Site and acceptance
- Location, applicable code/edition, project reviewer, load inputs and any licensed sign-off requirement.
- Array and interfaces
- Module drawing, array layout, roof covering/supports or geotechnical data, tilt, clearances and foundation concept.
- Supply schedule
- Chosen family, materials/finishes, fasteners, drains, quantities, drawings and responsibility for installation.
- Contract documents
- Producing legal entity, certificate holder/scope, report deliverables, inspection evidence, warranty, price and shipment basis.