On a blast furnace cast floor the slag runner is the side trough that starts at the skimmer. Iron and slag leave the taphole together; the lighter slag rides on top of the iron in the main trough, is held back by the skimmer and turned into a branch runner that ends at a slag ladle or a granulating pit, while the iron passes under the skimmer. [[bmi-runner]] The densities used in a 2020 CFD study, 6,900 kg/m³ for hot metal and 2,600 kg/m³ for slag, show why the split works by gravity. [[ge-2020-trough]] A Nippon Kokan patent puts slag entering its runner at about 1,500 °C and 2 to 3 t/min, and leaving an ordinary refractory trough at about 1,470–1,520 °C. [[nkk-cu-runner]]

Slag runners (slag troughs) on blast furnace cast floors: their place after the skimmer, the separation that feeds them, refractory linings and water-cooled copper designs, and where the slag goes. Main troughs and iron runners are described only where they set the conditions for the slag side. Slag launders on electric or ferroalloy furnaces follow different layouts.

CNFX editorial research · Updated · 7 sources

01

Where the slag runner starts: the skimmer and the branch

A slag runner is one branch in a network of troughs. The BMI patent on precast runners describes the usual layout: one main runner from the taphole and several branch runners, the first of which carries slag. [2]

Ge and co-workers give the property contrast that drives this separation: hot metal at 6,900 kg/m³ and 0.0045 Pa·s against slag at 2,600 kg/m³ and 0.25 Pa·s, so the slag layer is both lighter and roughly 55 times as viscous. [4] The viscosity ratio is an editorial calculation from those two values.

Main trough
Takes the mixed stream from the taphole. In the 2020 Laiwu study the liquid level sits about 300 mm below the trough top and the falling stream lands about 4 m from the reference point at the start of a cast. [4]
Skimmer (slag separator)
A refractory dam reaching down into the stream near the end of the main trough. Iron, being heavier, flows beneath it; slag is stopped and leaves through the branch. [2]
Slag runner
The branch from the skimmer to a slag ladle or a granulating pit. [2] Republic Steel's patent describes the same arrangement as an additional trough that drains slag to a slag disposal unit. [3]
Iron runners
Gates further along divert iron to ladles or bottle cars. [2] [3]

02

Slag temperature and flow rate in the runner

The Nippon Kokan (now JFE Engineering) patent on cooled slag runners, priority 1977, gives the clearest set of operating numbers for the slag side. [1]

QuantityFigure in the patent
Slag temperature entering the runnerAbout 1,500 °C [1]
Slag flow2 to 3 t/min; 2.0 t/min in the worked case [1]
Exit temperature from a refractory troughAbout 1,470–1,520 °C [1]
Cooling along a water-cooled copper runnerAbout 2–4 °C per metre [1]
Worked case40 m runner of 80 elements; slag falls about 85.7 °C to roughly 1,414 °C [1]

For comparison on the iron side, Yao et al. state that about 4–7.5 t/min of hot metal and slag together passes through the main trough of the 3,400 t/d furnace they modelled, with casts lasting 70 to 120 minutes. [5]

Temperature at the runner end matters most where slag is granulated: the patent links a cooler slag stream to denser granulated product, above 1.3 kg/l and about 1.5 kg/l with more cooling water. [1]

03

Refractory linings for slag troughs

Slag attacks a runner differently from iron, so suppliers sell separate grades for the slag branch.

Material typeSupplier and useNote from the source
High-SiC castable, precast or cast in placeRefratechnik REFRACAST for slag runners [6]Supplied as moist granulate or dry mix [6]
C/SiC-doped ramming mixRefratechnik REFRARAM for slag runners [6]Rammed lining alternative [6]
Universal ramming mixPrůmyslová keramika PK-V, mainly ancillary iron runners and slag runners [7]About 50,000 t of iron flowed without repair [7]
Rapid-install castablePrůmyslová keramika ULTRABET PK-B, main and ancillary iron runners and slag runners [7]Tapping possible 6 hours after installation [7]
High-resistance castable for the skimmerPrůmyslová keramika ULTRABET RM [7]Meant for skimmers and runner terminals [7]

Older practice described in the BMI patent used firebrick floors with a carbon-brick face plastered with clay before each cast; BMI replaced this with precast side blocks 12 to 48 inches long on a rammed base, joined by castable that locks the block ends together. [2]

The main trough upstream is commonly an Al₂O₃–SiC–C castable; Yao et al. model one at 2,850 kg/m³ with a thermal conductivity of 2.6 W/(m·K). [5]

04

Water-cooled copper slag runners

Nippon Kokan replaced the refractory trough with a chain of hollow copper or copper-alloy elements carrying cooling water, to stop slag sticking and lining wear at bends and runner ends. [1]

Element
About 500 mm long for handling; one-piece semicircular, two quarter-circle halves, or two L-shaped halves forming a rectangular channel [1]
Water passages
Zigzag partitions, narrower at the bottom where heat load peaks and wider at the sides [1]
Water supply
About 3 kg/cm² at about 3 m/s; 0.2 t/min per element in the example [1]
Reported result
Wear under one tenth of a refractory trough and about half the slag sticking [1]
Downstream
A gate with a fixed outlet area after the skimmer and an overflow pit; slag goes on to a granulation tank, a dry or wet pit, a spray unit or a slag ladle [1]

A two-part element lets the worn half be changed alone, which the patent presents as a cost advantage. [1]

05

How long runner linings last

Lining life is quoted in tonnes of iron cast or in days, and both figures come from the main trough more often than from the slag branch.

Republic Steel noted that conventional runner systems ran roughly 80 to 200 feet in length and often lasted only several casts, which is why shorter layouts and replaceable inserts were developed. [3]

Main trough, 3,000 m³ furnace
9 to 10 campaigns a year of about 35 days, each using 45 t of castable and five minor repairs of 3 t ramming mix [4]
Main trough, 3,400 t/d furnace
175 casts between repairs, about every 25 days; the model predicted 190 casts at the most stressed point [5]
Slag-runner ramming mix
Around 50,000 t of iron flowed before repair, for Průmyslová keramika PK-V [7]
Castable plus gunning repair
Over 300,000 t of iron flowed with ULTRABET PK-B and ŽÁROBET G-F gunning [7]
Copper element
Under one tenth of refractory wear in Nippon Kokan's trials [1]

06

What a slag runner quotation needs

The supplier has to know the slag stream and the end point before choosing a lining or a cooled trough.

  • Furnace output, casts per day and cast duration [5]
  • Slag rate in t/min at peak and the expected temperature at the skimmer [1]
  • Runner length, bends and the drop to the slag pot, pit or granulator
  • Lining choice: SiC castable, ramming mix or water-cooled copper elements [6] [1]
  • Skimmer material and how it is replaced [7]
  • Granulated slag density target if the slag is granulated [1]
  • Cooling water pressure and flow available for cooled designs [1]

07

Cast house slag trough: lining or cooled-element offer

Paste it into your enquiry below or into an email to a maker, then replace every bracket.

Furnace: [output t/d; casts per day; cast length min]
Slag stream: [t/min peak; temperature at skimmer]
Route: [runner length m; bends; slag pot / pit / granulator]
Construction: [castable; ramming mix; copper elements]
Skimmer: [material; replacement method]
Cooling water: [pressure; flow available]
Requested: [lining tonnage guarantee; installation and curing time]

See manufacturer records Send an enquiry through CNFX

Slag runner refractory and trough suppliers

Refratechnik lists castables and ramming mixes for slag runners on its blast furnace page [[refratechnik-bf]]; Průmyslová keramika lists runner castables, ramming mix and a skimmer castable in its cast-bed brochure. [[prumker-bf]]

Sourcing Slag Runner from China?
Tell us your specification and target quantity — we will match it against manufacturer records and come back with the factories that fit.
Request manufacturers We manufacture this

Explore company information and manufacturing capabilities, then discuss the scope of your project with a relevant supplier.

Related Components

Valve Body
Valve body is the main structural housing of a molten metal flow control valve, designed to withstand extreme temperatures and corrosive environments while directing metal flow.
Refractory Liner
Refractory liner for molten metal flow control valves, providing thermal insulation and erosion resistance in extreme temperature applications.
Work Rolls
Work rolls are precision cylindrical components in heavy-duty rolling mills that directly contact and deform metal during rolling operations.
Venting Channels
Venting channels are precision-engineered passages in metal casting mold cores designed to allow gases to escape during the molten metal pouring process, preventing defects and ensuring high-quality castings.

Buyer questions

What is a slag runner?

The branch trough on a blast furnace cast floor that takes slag stopped by the skimmer and carries it to a slag ladle or granulating pit. [2]

What is a slag separator in a runner system?

The skimmer: a dam near the end of the main trough. Iron flows under it; the lighter slag is held back and turned into the slag runner. [2] [4]

How hot is slag in the slag runner?

About 1,500 °C at entry in a Nippon Kokan patent, leaving a refractory trough at about 1,470–1,520 °C. [1]

What refractory is used for slag runners?

High-SiC castables and C/SiC-doped ramming mixes are offered for slag runners; one Czech supplier quotes about 50,000 t of iron between repairs for its ramming mix. [6] [7]

Sources and what still needs a direct check

Sources checked 2026-11-11T05:12:16+08:00. Layout and lining construction come from the BMI and Republic Steel runner patents; slag temperatures, flows and the copper trough from the Nippon Kokan patent; fluid properties and trough campaigns from Ge et al., Processes 8 (2020) 249, and Yao et al., Materials 14 (2021) 4851; lining products from Refratechnik and Průmyslová keramika.

  1. US 4,177,974 A — Molten slag runner for blast-furnace plant (Nippon Kokan K.K.; JP priority 1977) ↗ Patent Return to text ↑
  2. US 4,478,395 A — Refractory runner (BMI, Inc.; filed 1982) ↗ Patent Return to text ↑
  3. US 4,429,860 A — Runner system for transferring molten metal (Republic Steel Corp.; filed 1982) ↗ Patent Return to text ↑
  4. Ge, Li, Wei, Liang, Wang, Yu — Numerical Analysis on Velocity and Temperature of the Fluid in a Blast Furnace Main Trough, Processes 8(2):249 (2020), LAPSE:2020.0394, CC BY 4.0 ↗ Peer-reviewed journal article Return to text ↑
  5. Yao et al. — Numerical Analysis on Erosion and Optimization of a Blast Furnace Main Trough, Materials 14(17):4851 (2021) ↗ Peer-reviewed journal article Return to text ↑
  6. Refratechnik — Iron & steel applications: blast furnaces and runner systems ↗ Manufacturer product page Return to text ↑
  7. Průmyslová keramika — Refractories for the casting beds of blast furnaces (brochure PDF) ↗ Manufacturer brochure Return to text ↑

Still to check yourself

  • Measure slag flow and temperature at the skimmer.
  • Decide where the slag ends: pot, pit or granulator.
  • Ask for lining life in tonnes cast.

Request Manufacturing Insight for Slag Runner

Thank you. Your request has been sent. We'll respond within 1–3 business days.
Sorry, we couldn't send your message. Please try again, or email us at [email protected].
Zinc Coating
Get QuotesChat