Hold the substrate securely and verify temperature where the bond is made
A wire-bonding heater stage supports and heats the substrate or package while the bonder makes the interconnections. Its workholding surface, clamp or vacuum arrangement and installed height must fit the part and bonder. Specify the thermal requirement at the loaded workpiece as well as the stage and controller ratings.
Heated substrate/package workholders and interchangeable heater stages for wire-bonding machines, including their top plates, clamping/vacuum interfaces and temperature-control connections. Complete wire bonders are covered on page 8639. Underfill/adhesive dispensing preheat zones on page 3511, ovens, microscope hot stages and capillary/tool heaters have separate supply scopes.
01
TPT lists height-adjustable stages with vertical clamps or vacuum fixation, replaceable top plates and an external-controller option. Match these options to the part and bonder. [1]
Provide the substrate/package drawing, underside features and bond locations. Define the support/contact surface and the areas available for mechanical clamps or vacuum sealing. Include acceptable part deflection and surface marking in the fixture review.
Check the working height, mounting datums and clearance to the capillary or wedge, clamp and vision field throughout the bonding motion. Approve any custom top plate and the part-loading method against the specific bonder model.
02
TPT’s stage page states up to 250 °C; HB100’s controller row states up to 200 °C ±1 °C. Obtain the delivered combination’s limits. [1] [2]
Define the required temperature at the relevant workpiece surface, with the actual substrate, fixture and clamping arrangement installed. Agree sensor locations, measurement method, calibration and the allowed heating/soak conditions.
Specify spatial uniformity separately from time stability. For uniformity, identify measurement locations and the permitted spread; for stability, identify the location, time interval and permitted change after settling.
Request warm-up, settling and cooling results under the intended load and ambient conditions. Include controller sensor type, sensor placement, electrical connections and any independent over-temperature protection in the assembly specification.
03
Palomar’s manufacturer-authored study demonstrates heated-capillary gold-ball bonding for selected plastic-packaged parts while the parts remain at room temperature. It is an alternative heating arrangement for those applications, not a universal replacement for substrate heating. [3]
Set the part’s thermal budget with the bonding-process owner, including limits from the package, die attach and other materials. Identify whether the process uses substrate heat, tool heat or a defined combination.
Qualify the fixture and temperature conditions with the actual wire, bond tool, substrate and recipe. Agree the required bond-quality inspections and tests before approving a temperature or workholder change.
04
This functional reference describes the workholder and its interfaces. Obtain the actual construction; heater technology, insulation, controller integration and active cooling depend on the supplied design.
| Function | Define for the stage | Evidence or drawing |
|---|---|---|
| Top plate and workholding | Support surface, clamp/vacuum arrangement and part loading. | Part-fit drawing, clearance and retention trial. |
| Heating elements | Heater location, electrical connection and replacement scope. | Actual heater specification and assembly thermal results. |
| Temperature sensing | Sensor type, location and connection to the controller. | Sensor map, calibration and workpiece-measurement method. |
| Insulation / thermal isolation | Heat path toward the stage mount and surrounding equipment. | Construction and installed thermal assessment. |
| Cooling channels / active cooling, if fitted | Cooling medium, connections and operating sequence. | Specified cooling performance, leakage and utility requirements. |
| Temperature controller, PID if implemented | Power regulation, feedback, setpoint limits and protection. | Matched controller/firmware, wiring and tested response. |
05
Use the delivered workholder, top plate, controller and part as the test configuration. The complete bonder’s electrical and mass data apply to the machine scope.
| Field | Define in the order | Acceptance evidence |
|---|---|---|
| Heating plate size (mm) | Working/support area, vacuum/clamp zones and part clearances. | Controlled top-plate and mounting drawing. |
| Temperature range (°C) | Required loaded-part range and limits of the stage/controller combination. | Configuration-specific ratings and measured workpiece results. |
| Temperature uniformity (°C) | Measurement locations, surface, load, soak and permitted spatial spread. | Calibrated temperature map under the agreed conditions. |
| Temperature stability (°C) | Measurement point, time interval and settled operating conditions. | Recorded temperature versus time for the loaded fixture. |
| Heating rate (°C/min) | Start/end temperatures, load and allowed overshoot. | Measured heating and settling profile. |
| Cooling rate (°C/min) | Start/end points and natural/active cooling arrangement. | Measured profile with stated utilities and load. |
| Power supply (V) | Stage/controller electrical scope, connector and supply requirements. | Matched wiring and power-source specification. |
| Power consumption (W) | Heater/controller demand during warm-up and holding. | Mode-specific demand for the supplied assembly. |
| Temperature control accuracy (°C) | Measurement quantity, reference, sensor and operating conditions. | Calibration/error basis distinct from surface uniformity. |
| Heater type | Actual heating element and replaceability. | Construction and replacement instructions. |
| Plate material | Support/contact material, finish and surface requirements. | Part drawing and material compatibility. |
| Weight (kg) | Stage, top plate, mounting and controller scope. | Mass and bonder-mounting compatibility. |
| Operating humidity (% RH) | Ambient exposure and condensation restrictions. | Assembly environmental limits. |
| IP rating | Exposed assembly/components and installation conditions. | Declared protection evidence for the supplied scope. |
| Bonder fit and workpiece retention | Working height, access, clamp/vacuum and mounting datums. | Installed fit check and agreed process trial. |
06
Paste it into your enquiry below or into an email to a maker, then replace every bracket.
Bonder: [make/model; stage mount; working height; tool/vision clearance] Workpiece: [substrate/package; dimensions; underside; bond locations] Fixture: [support; top plate; clamp/vacuum; part-loading method] Temperature: [loaded-part target; thermal budget; uniformity/stability method] Assembly: [heater; sensor; controller; power; cooling if required] Acceptance: [fit/retention; temperature map/profile; process and bond checks]
Provide the part and bonder-interface drawings with the loaded-workpiece temperature requirements. Ask for the top plate, retention method, controller/sensor configuration and the fit, thermal and process evidence for the proposal.
Explore company information and manufacturing capabilities, then discuss the scope of your project with a relevant supplier.
Confirm its working height, clamping/vacuum arrangement, top plate and controller connection. [1]
Request a separate temperature map of the loaded workpiece and fixture. [2]
Obtain the rating and validation for the exact delivered combination. [1] [2]
Palomar reports a heated-tool alternative for selected parts; qualify the actual process and thermal budget. [3]
Sources checked 2026-10-19. TPT separates workholding options from its HB100 host/controller example. Palomar demonstrates a heated-tool process for selected applications. Keep each example within its stated scope.
Ask for use case, specification boundaries, supplier type, and RFQ preparation information for this product.
Compare manufacturer profiles with relevant product and process capability.