A blast furnace tuyere that injects hot air into the furnace for iron smelting.
| Parameter | Typical range | Notes & selection driver |
|---|---|---|
| Diameter | 100-200 mm | |
| Service Life | 6-24 months | |
| Blast Pressure | 2-5 bar | |
| Blast Temperature | 800-1300°C | |
| Cooling Water Flow | 10-30 m³/h |
Ranges are indicative industry figures for RFQ preparation, not a supplier commitment. Confirm every value and standard with the legal manufacturer before ordering.
This component is used in the following industrial products
A practical evidence checklist for RFQ preparation and supplier evaluation.
CNFX does not score or rank suppliers. Buyers must verify all claims and documents with the legal manufacturer before ordering.
Manufacturer profiles associated with Bosh.
Manufacturer listings support early research and capability understanding. They are not certification, ranking, or transaction guarantees.
To inject preheated air into the furnace, enabling coke combustion and iron ore reduction by generating heat and carbon monoxide.
Copper's high thermal conductivity allows efficient heat dissipation through water cooling, preventing melting and extending service life in high-temperature environments.
Typically every 6 to 24 months, depending on operating conditions, material quality, and maintenance practices, to avoid failures that disrupt production.
Editorial classification, named public sources where available, and source-reviewed manufacturer records. See the editorial policy.