Editorial Technical Reference

Offshore drilling rig (mobile offshore drilling unit)

Mobile offshore drilling units · Unit type (jackup, semisubmersible, drillship), water depth and drilling depth, hook load, variable deck load, mud pumps and BOP rating, power, station keeping, accommodation and helideck

An offshore drilling rig is a mobile unit that carries a drilling package to sea to drill oil and gas wells, and its hull type decides where it can work. Settle three things before asking for quotes or a charter: the unit type for the water depth and seabed, the drilling capacity — depth, hook load, mud pumps and BOP pressure — the wells need, and the deck load, power, station keeping and accommodation the campaign requires.

Mobile offshore drilling units — self-elevating (jackup), column-stabilised (semisubmersible) and surface-type (drillship and barge) — as purchased or chartered complete. Land drilling rigs, workover rigs, fixed production platforms and individual drilling-package components sold alone are outside this page; land oil drilling rigs and mud pumps have their own pages.

CNFX editorial research · Sources checked October 12, 2026 · 4 sources

01

Pick the unit type and water depth

US Coast Guard rules (46 CFR 107.111) define a mobile offshore drilling unit as a vessel capable of drilling for subsea resources, and distinguish a self-elevating unit, with movable legs that raise its hull above the sea surface; a column-stabilised unit, whose main deck is connected to an underwater hull or footings by columns or caissons; and a surface-type unit, a ship-shaped or barge hull operating afloat. [1]

Noble's BlackHawk is a Gusto P10000 dual-activity drillship rated for 12,000 ft water depth, held on station by six 5,000 kW azimuth thrusters with no mooring system. Noble's Great White is a Moss CS60E semisubmersible rated for 9,840 ft (3,000 m) as outfitted, with eight Rolls-Royce mooring winches rated at 450 t pull and eight 4,800 kW azimuth thrusters. [2] [3]

Editorial calculation: 12,000 ft is about 3,660 m and 40,000 ft about 12,190 m; ask the contractor how the drilling depth rating is referenced before comparing it with your well's total depth. [2]

Give the supplier or contractor the location, water depth, seabed and metocean conditions, well design and total depth, BOP pressure rating, hook load, mud system and pump pressure, deck load for the campaign, station-keeping method (legs, moorings, dynamic positioning), power, accommodation, helideck and flag or class requirements, and the period.

02

Check drilling package, deck load and power

The BlackHawk lists 40,000 ft drilling depth, hook load of 2.5 million lb (main) and 1.5 million lb (auxiliary), five NOV 14-P-220 mud pumps at 2,200 hp and 7,500 psi, two 18¾-inch 15k psi seven-ram BOPs, 70,459 t displacement, 21,150 t variable deck load, 210 beds, and main power from six 4,500 kW and two 9,000 kW generator sets. [2]

The Great White lists 35,000 ft (10,670 m) drilling depth, a 1,000 short-ton hook load, four 7,500 psi mud pumps, 68,375 t displacement, 7,500 t variable deck load when drilling (6,000 t in transit), 180 beds, eight 6,120 kW diesel engines and a helideck for EH-101 and Sikorsky S-61/92 helicopters. [3]

Editorial calculation: 2.5 million lb is about 1,130 t; compare the hook load with the heaviest casing string in your well design, not with the drilling depth alone. [2]

03

Check the subsea BOP configuration US rules require

For work on the US outer continental shelf, the Bureau of Safety and Environmental Enforcement's rule 30 CFR 250.734 requires a subsea BOP system to have at least five remote-controlled, hydraulically operated BOPs: at least one annular BOP, two BOPs with pipe rams and two with shear rams. Both shear rams must be able to shear drill pipe, workstring, tubing and their control lines under maximum anticipated surface pressure (MASP), and at least one must seal the well after shearing. The system must also have a redundant pod control system; accumulator capacity, including subsea bottles for the autoshear and deadman functions, to close each shear ram, the ram locks and one pipe ram and disconnect the lower marine riser package; ROV intervention capability within the response times of API Standard 53; and a trained ROV crew on the rig whenever the BOP is deployed. Dynamically positioned rigs need autoshear, deadman and emergency disconnect (EDS) systems; moored rigs need autoshear and deadman, and each must close at least two shear rams in sequence. [4]

Compare this with the 15,000 psi BOP and drilling packages listed for the drillship and semisubmersible above; for a US Gulf campaign the stack must meet the ram count and emergency-system rules as well as the pressure rating. [2] [3] [1]

Editorial calculation: 1 annular + 2 pipe-ram + 2 shear-ram BOPs gives the minimum of 5 BOPs the rule sets; a DP drillship needs three emergency shut-in modes (autoshear, deadman, EDS) against two for a moored semisubmersible.

30 CFR 250.734 requirementValue
Remote-controlled hydraulic BOPsAt least 5
Annular BOPsAt least 1
Pipe-ram BOPs2
Shear-ram BOPs2, at least 1 sealing after shearing
Emergency systems, DP rigAutoshear, deadman and EDS
Emergency systems, moored rigAutoshear and deadman
Shear rams closed by emergency systemsAt least 2, in sequence

For a US offshore contract, ask the drilling contractor for the BOP stack drawing with ram types, the shear capability test results under MASP, the accumulator calculation and the emergency system configuration for the rig's station-keeping mode.

04

ZPMC jack-ups and CIMC Raffles semisubmersibles

Shanghai Zhenhua Heavy Industries Co., Ltd. (ZPMC) lists jack-up rigs on its website, and Yantai CIMC Raffles Offshore Limited lists semi-submersible drilling platforms.

Ask each builder or contractor for the rig specification sheet with design, water and drilling depth, hook load, deck load, mud pumps, BOP and power figures. [2] [3]

05

Hull, station keeping, hoisting and well-control systems

The two Noble units hold station in different ways: the BlackHawk drillship has no mooring system and relies on thrusters, while the Great White semisubmersible combines mooring winches with thrusters.

SystemWhat it controlsFix in the order
Hull type (legs, columns, ship hull)Water depth; motion. [1] [3] [2]Unit type.
Station keeping (legs, moorings, thrusters)Holding position. [2] [3]Moorings; DP.
Derrick and hoistingHook load. [2] [3]lb or t.
Mud pumps and well control (BOP)Pressure; well control. [2] [3]psi; rams.
Power generationDrilling and thrusters. [2] [3]kW.
Accommodation and helideckCrew; transfer. [2] [3]Beds; helicopter type.

06

BlackHawk and Great White figures, row by row

Where a row has two values, the first is the BlackHawk drillship and the second the Great White semisubmersible. Neither Noble sheet gives an operating temperature or a free deck area, so those rows have to come from the contractor.

FieldWhat it means and published valuesAsk the supplier for
Water Depth Rating12,000 ft (drillship); 9,840 ft (semi). [2] [3]ft; outfitted.
Drilling Depth Capacity40,000 ft; 35,000 ft. [2] [3]ft.
Hook Load Capacity2.5 million lb; 1,000 short tons. [2] [3]lb or short tons.
Variable Deck Load21,150 t; 7,500 t drilling. [2] [3]t.
Mud Pump Pressure7,500 psi. [2] [3]psi; pumps.
Operating TemperatureDesign environment.°C.
Power Rating6 × 4,500 + 2 × 9,000 kW; 8 × 6,120 kW. [2] [3]kW.
Deck AreaFree deck area.m².
Displacement70,459 t; 68,375 t. [2] [3]t.
Mooring SystemNone, thrusters (drillship); 8 winches at 450 t (semi). [2] [3]Lines; DP class.
Helideck CapacityEH-101, S-61/92 (semi). [3]t; helicopter type.
Subsea BOP stack (US OCS)≥ 5 BOPs: ≥ 1 annular, 2 pipe-ram, 2 shear-ram; autoshear, deadman (+ EDS on DP rigs) (30 CFR 250.734). [4]Stack drawing and shear test data.

07

Send the site, well and campaign data together

Paste it into your enquiry below or into an email to a maker, then replace every bracket.

Site: [location; water depth; seabed; metocean]
Well: [total depth; BOP rating; casing loads]
Unit: [jackup; semisubmersible; drillship]
Package: [hook load; mud pumps psi]
Deck/power: [t; kW]
Station keeping: [legs; moorings; DP]
Crew: [beds; helideck]
Period: [dates]

See manufacturer records Send an enquiry through CNFX

Find offshore drilling rig manufacturers

2 companies list this product among what they make. Company figures are quoted from each company's own website; every card states where the relationship came from.

Shanghai Zhenhua Heavy Industries Co., Ltd. (ZPMC)
Manufacturing site to be confirmed for the order

Its website lists jack-up rigs.

Product scope checked 2026-10-12

Current product source ↗

Product page on own website · profile compiled by CNFX from public sources
Yantai CIMC Raffles Offshore Limited
Manufacturing site to be confirmed for the order

Its website lists semi-submersible drilling platforms.

Product scope checked 2026-10-12

Product page on own website · profile compiled by CNFX from public sources

Explore company information and manufacturing capabilities, then discuss the scope of your project with a relevant supplier.

Share this page

Buyer questions

What types of offshore drilling rigs are there?

US rules define self-elevating (jackup) units with movable legs, column-stabilised (semisubmersible) units and surface-type ship or barge hulls such as drillships. [1]

How deep can an offshore drillship work?

Noble's BlackHawk drillship is rated for 12,000 ft water depth and 40,000 ft drilling depth. [2]

How do semisubmersibles stay on location?

Noble's Great White uses eight mooring winches rated at 450 t pull plus eight azimuth thrusters. [3]

What mud pump pressure do offshore rigs use?

Both Noble units reviewed list NOV 14-P-220 pumps rated at 7,500 psi. [2] [3]

How many BOPs must a subsea BOP stack have on the US OCS?

30 CFR 250.734 requires at least five remote-controlled hydraulic BOPs: at least one annular, two pipe-ram and two shear-ram BOPs, with autoshear and deadman systems and, on DP rigs, an emergency disconnect sequence. [4]

Sources and what still needs a direct check

Sources checked 2026-10-12. US Coast Guard definitions in 46 CFR 107.111 and Noble Corporation rig specification sheets are used to show what an offshore drilling rig specification covers; values for your project must come from the builder's or contractor's specification.

  1. 46 CFR 107.111 — Definitions (mobile offshore drilling unit, self-elevating, column-stabilized and surface-type units) ↗ US federal regulation Return to text ↑
  2. Noble Corporation — Noble BlackHawk drillship rig summary ↗ Contractor rig specification Return to text ↑
  3. Noble Corporation — Noble Great White semisubmersible specification sheet ↗ Contractor rig specification Return to text ↑
  4. 30 CFR 250.734 — Requirements for a subsea BOP system (BSEE, eCFR) ↗ Regulation Return to text ↑

Still to check yourself

  • Pick unit type.
  • Confirm water depth.
  • Set drilling depth and hook load.
  • Check BOP and mud pumps.
  • Plan station keeping.
Buyer enquiry

Request manufacturing insight for Offshore Drilling Rig

Ask for use case, specification boundaries, supplier type, and RFQ preparation information for this product.

Where it goes
Straight to the CNFX editorial desk, and to the manufacturer if this product is linked to a claimed profile. Nothing is broadcast to a supplier list.
Your details stay here
We do not sell or rent enquiry data, and we do not add you to a mailing list. Used only to answer this request.
No commission, no middleman
CNFX is a directory. We take no cut of any order and never negotiate on a supplier's behalf.
What to include
Share your product specifications, quantity, destination and target delivery date.

Your business information is used only to process this request.

Thank you! Your message has been sent. We'll respond within 1–3 business days.
Sorry, we couldn't send your message. Please try again, or email us at [email protected].

Need to Manufacture Offshore Drilling Rig?

Compare manufacturer profiles with relevant product and process capability.

Previous Product
Needle Valve
Next Product
Oil Drilling Rig
Get QuotesChat