Telescopic truck cranes · Maximum capacity versus lifting moment and radius, boom and jib length, outrigger span, required safety devices and operational aids, road travel
A truck crane is a mobile crane with a telescopic boom and slewing superstructure mounted on a road-going truck chassis, travelling to site on its own wheels and lifting on outriggers. Ask three things first: what load chart (capacity at each radius and boom length) the lifts need, what outrigger span and ground bearing the site allows, and which safety devices and operational aids the crane has under the rules where it will work.
Telescopic-boom truck cranes on commercial or purpose-built truck chassis. All-terrain and rough-terrain cranes, crawler cranes, knuckle-boom loader cranes, tower cranes and crane parts sold separately are outside this page except where compared.
Start with your task
01
SANY's STC250T5 truck crane page lists a 25 t maximum lifting capacity, a five-section U-shaped boom from 10.7 m (basic) to 41 m (fully extended), 49 m with the fixed jib, maximum lifting heights of 11.2, 41.5 and 49.5 m, maximum lifting moments of 1,142 kN·m on the basic boom, 727 kN·m on the full boom and 390 kN·m with the jib, an outrigger span of 6.4 × 5.35 m, a 6×4×2 chassis and 88 km/h maximum travel speed. [1]
Editorial calculation: the 25 t maximum is about 245 kN, which at the basic-boom moment of 1,142 kN·m corresponds to a radius of about 1,142 / 245 ≈ 4.7 m; at full extension the 727 kN·m moment allows about 727 / 9.81 ≈ 74 t·m, for example roughly 3.7 t at 20 m. These are moment checks only; the maker's load chart for the boom and outrigger setting governs every lift. [1]
Editorial note: send the supplier each critical lift (load, radius, height, rigging weight) so the load chart can be checked for the boom and outrigger configuration that the site allows.
Give the supplier the heaviest and furthest lifts with radii and heights, rigging weights, site access and outrigger space, ground bearing capacity and mats, road regulations for travel (axle loads, dimensions), operating climate, operator and inspection requirements, and the standard the crane must meet.
02
OSHA's construction crane rule 29 CFR 1926.1415 requires a crane level indicator, boom stops (except hydraulic booms), jib stops if a jib is fitted, locks on foot-pedal brakes, an integral holding device or check valve on hydraulic outrigger and stabilizer jacks, and a horn, with no alternative measures allowed when they fail. [2]
Section 1926.1416 lists operational aids: a boom angle or radius indicator readable from the operator's station, jib angle indicator for luffing jibs, anti two-blocking devices on telescopic boom cranes made after 28 February 1992, and for cranes over 6,000 lb rated capacity made after 29 March 2003 a load weighing device, load moment (rated capacity) indicator or limiter; outrigger or stabilizer position sensors and hoist drum rotation indicators are Category II aids, to be repaired within 30 days. [2]
Editorial note: ask the supplier which of these devices are fitted as standard, how the load moment system is calibrated for each boom and outrigger configuration, and what certificates come with the crane.
03
XCMG's XCT25_Y1 page describes a 3-axle, 25 t truck crane with a 4-section 33.5 m boom and an 8.15 m fixed jib, listing a lifting capacity of 6.1 t with boom and jib fully extended. Its parameter table gives a maximum hoist height of 41.6 m, a maximum load moment of 941 kN·m, an SC7H260Q3 drive engine of 192 kW, 4×2 drive and steering, 85 km/h driving speed, a dead weight in travel state of 24,510 kg, dimensions of 12,207 × 2,500 × 3,450 mm and emission standard China III. [4]
Set beside SANY's STC250T5, the two cranes share the 25 t headline but differ in boom length, moment and chassis, as the table shows. Editorial calculation: at 25 t (about 245 kN), the XCT25_Y1's 941 kN·m corresponds to a radius of about 3.8 m, against about 4.7 m for the STC250T5's 1,142 kN·m basic-boom moment; the SANY figure is about 1.21 times the XCMG figure. As before, this is a moment check only, and each maker's load chart governs. [4] [1]
Editorial calculation: 24,510 kg spread over three axles would average about 8,170 kg per axle, but the real split between front and rear axles is not on the page. Road-travel limits apply per axle, so ask the supplier for the axle loads in travel state with the counterweight and jib carried, and check them and the 2,500 mm width against the roads to site. The page lists emission standard China III; state the emission standard required where the crane will be registered. [4]
| Row | SANY STC250T5 | XCMG XCT25_Y1 |
|---|---|---|
| Maximum capacity | 25 t. [1] | 25 t. [4] |
| Main boom (full) | 41 m, five sections. [1] | 33.5 m, four sections. [4] |
| Boom with jib | 49 m. [1] | 33.5 m boom + 8.15 m fixed jib; 6.1 t fully extended. [4] |
| Maximum hoist height | 49.5 m with jib. [1] | 41.6 m. [4] |
| Maximum load moment | 1,142 kN·m (basic boom). [1] | 941 kN·m. [4] |
| Chassis and travel speed | 6×4×2; 88 km/h. [1] | 3 axles, 4×2; 85 km/h. [4] |
| Travel weight and size | Ask the supplier. | 24,510 kg; 12,207 × 2,500 × 3,450 mm. [4] |
04
The suppliers reviewed list truck cranes and truck-mounted cranes; ask each for the full load chart, boom and jib lengths, outrigger spans, chassis and engine, safety devices and operational aids, and road-travel weights and dimensions.
05
The UK Health and Safety Executive's LOLER code (L113, 2014) requires lifting equipment exposed to deteriorating conditions to be thoroughly examined at least every 12 months, or at least every 6 months for equipment lifting persons and for lifting accessories, or under an examination scheme, and again after exceptional circumstances. Equipment may not leave a business, or be used when received from another business, without physical evidence that the last thorough examination was done. New equipment needs no examination before first use only if it is unused and comes with an EC declaration of conformity made not more than 12 months before it is put into service. [3]
HSE's guidance says the competent person should complete and forward the examination report within 28 days, and that reports under the periodic regime must be kept until the next report or for two years, whichever is later. For a mobile crane with a telescopic jib, whose safe working load varies with radius and configuration, including outriggers set or 'free on wheels', HSE expects the SWL for each configuration to be marked or available to the operator, and lists rated capacity indicators and limiters as the devices for high-risk work such as construction. [3]
Editorial note: for UK work, ask the supplier for the declaration of conformity with its date, the first thorough examination report, the load charts for every outrigger setting and on-wheels duty, and confirmation that the rated capacity limiter covers each configuration.
06
| Part | Role | Fix in the order |
|---|---|---|
| Truck chassis | Road travel. [1] | Wheel formula; axle loads. |
| Telescopic boom and jib | Reach and height. [1] | Sections; lengths. |
| Slewing superstructure | Rotate the boom. | Speed; brake. |
| Outriggers with check valves | Stability. [1] [2] | Span; holding valves. |
| Hoist | Lift the load. | Speed; line pull. |
| Load moment and angle indicators | Prevent overload. [2] | Devices fitted. |
| Anti two-block and level indicator | Required safety items. [2] | Fitted items. |
07
Maximum capacity and boom length are headline numbers; the working radius for your loads and the travel-state weight are the rows that decide whether the crane suits the lift and the road.
| Field | What it means and published values | Ask the supplier for |
|---|---|---|
| Maximum Lifting Capacity (metric tons) | E.g. 25 t. [1] | Load chart. |
| Maximum Boom Length (meters) | E.g. 41 m, 49 m with jib; 33.5 m plus 8.15 m jib. [1] [4] | Boom and jib. |
| Maximum Working Radius (meters) | From load chart. | Radius for your loads. |
| Engine Power (kilowatts) | Chassis and crane engine; e.g. 192 kW drive engine. [4] | Power; emissions. |
| Outrigger Spread (meters) | E.g. 6.4 × 5.35 m. [1] | Full and partial spans. |
| Maximum Lifting Height (m) | E.g. 41.5 m; 49.5 m with jib. [1] | Heights. |
| Hoisting Speed (m/min) | Hoist. | Speed. |
| Slewing Speed (r/min) | Slewing. | Speed. |
| Operating Temperature (°C) | Climate. | Range. |
| Hydraulic System Pressure (MPa) | Hydraulics. | Pressure. |
| Gradeability (%) | Road travel. | Value. |
| Overall weight in travel state (kg) | 24,510 kg on one 25 t crane. [4] | Weight; axle loads. |
08
Paste it into your enquiry below or into an email to a maker, then replace every bracket.
Lifts: [load; radius; height; rigging] Site: [outrigger space; ground bearing] Road: [axle limits; dimensions] Crane: [load chart; boom; jib] Safety: [devices; LMI; anti two-block] Compliance: [standard; inspection; operator] Support: [service; parts]
SANY Group lists the STC250T5 next to its all-terrain, rough-terrain and crawler cranes. Jining Jiubang lists 3–20 t truck cranes with aerial work platforms, Shandong Enmax lists truck-mounted cranes on commercial chassis, and Shandong Honour SHINE GROUP sells truck cranes with tractor and bulk-cement trucks.
Lists truck cranes such as the STC250T5 with all-terrain, rough-terrain and crawler cranes.
Product scope checked 2026-10-11
Lists 3–20 t truck cranes with aerial work platforms.
Product scope checked 2026-10-11
Lists truck-mounted and mobile truck cranes on commercial chassis.
Product scope checked 2026-10-11
Lists truck cranes with tractor, bulk cement and other special trucks.
Product scope checked 2026-10-11
Explore company information and manufacturing capabilities, then discuss the scope of your project with a relevant supplier.
SANY's STC250T5 lists a 727 kN·m moment at its 41 m full boom, about 3.7 t at 20 m by moment alone; the load chart governs. [1]
A crane level indicator, outrigger jack check valves, a horn and, where applicable, boom and jib stops and brake-pedal locks (29 CFR 1926.1415). [2]
Under OSHA 1926.1416, cranes over 6,000 lb made after March 2003 need a load weighing device or load moment indicator or limiter. [2]
HSE's LOLER code L113 requires a thorough examination at least every 12 months (every 6 months if it lifts persons) or under an examination scheme, and after exceptional circumstances. [3]
Sources checked 2026-10-12. 29 CFR 1926 Subpart CC is the US federal construction crane rule and HSE's L113 the UK LOLER code; other countries have their own. SANY and XCMG describe their own cranes.