Bulk ship unloaders · screw, chain (mechanical), pneumatic and grab types, capacity range by model and commodity, vessel size and boom length, reach into the hold, dust and spillage
A ship unloader removes bulk cargo from a vessel's holds at a berth: continuous unloaders lift it with a vertical screw, a chain conveyor or air (pneumatic) through a boom that reaches into the hold, while grab unloaders lift it in a clamshell grab on a crane. Ask three things first: which principle suits your cargo and environmental limits, what capacity the machine gives for that cargo and vessel size, and how far it reaches into the hold and under the hatch rim.
Continuous screw, chain (mechanical) and pneumatic ship unloaders and grab-type unloaders for dry bulk such as grain, cement, coal, fertilizer and minerals, rail-mounted, mobile or fixed. Ship loaders (a separate product page), container cranes, barge-only unloaders and conveyors sold alone are outside this page except where compared.
01
Siwertell, a screw-type unloader maker, describes its C-type as a high-capacity continuous screw unloader mainly used for non-free-flowing, compact commodities that need high digging capability, with a winch-luffed horizontal arm and fixed counterweight, and says the C-type "is often used for off shore and narrow quay applications in terminals with high annual throughput". Its product table separates models for free-flowing cargo (cement, alumina, ground slag, dry fly ash, grain, animal feed) from models for various cargo including coal, fertilizers, minerals and chemicals. [1]
Bühler, a maker of mechanical (chain) unloaders, argues in a 2019 IAOM presentation that tightening rules on dust emission, spillage and noise, and food-safety separation of grain terminals, are moving grain terminals away from grab unloaders; it describes its Portalink unloader leg on a spherical suspension and an auto-sink feature that compensate for vessel movement, slewing and luffing with kick-in and kick-out to reach under the hatch rim, and a slow-moving product column for gentle handling and low energy per tonne. It notes that vertical suspended unloaders cannot reach under the hatch rim and that the working range affects clean-up time. [2]
Editorial note: the sources are makers arguing for their own principles; ask each supplier for energy per tonne, clean-up method and achieved average rates on comparable cargo and vessels.
Give the supplier the commodities and their flow properties, bulk density and temperature, annual tonnage and required capacity, vessel sizes (DWT, hatch sizes, hold depth, air draft at all tides), berth type (quay, jetty, offshore) and loads, onward conveying, dust, spillage and noise limits, food-safety requirements, power supply and clean-up arrangements.
02
Siwertell's table gives capacity ranges by model: 100–300 t/h for 5,000 to 15,000 dwt ships on free-flowing cargo (5,000 S and 10,000 S), 200–550 t/h for 15,000 S units, 200–800 t/h for Panamax F and G types, 500–2,500 t/h for C- and D-types serving ships up to 180,000 and 200,000 dwt, 600–1,600 t/h for the Cape-size M-type, and 200–550 t/h for its grain PortMaster up to 120,000 dwt, mounted on rails, tyres, fixed or offshore. It states that capacity depends on material, ship size and other factors. [1]
Bühler's range runs from the Portalino 300 (300 t/h, 20 m boom, 3,000–30,000 DWT) and Portalink 400 (400 t/h, 25 m, up to 60,000 DWT) to Portalink 600–1,300 (600–1,300 t/h, 25–32 m booms, 10,000–120,000 DWT). [2]
Editorial calculation: a 60,000 t grain cargo at a nominal 1,100 t/h takes about 60,000 / 1,100 ≈ 55 hours of unloading, and at 2,500 t/h about 24 hours, before hatch changes and clean-up, which reduce the average rate. Cargo size is an assumed example; ask for the average rate over a full vessel, not only the peak.
03
German maker NEUERO describes its pneumatic ship unloaders as custom-built to site conditions, from power supply to boom length, and states capacities on wheat: up to 1,000 t/h per conveying line and up to 2,000 t/h on a rail-mounted tower with two separate conveying lines. Machines can be stationary, rail-mounted or on a rubber-tyred chassis, fed by low or medium voltage or by diesel generator, with an ATEX explosion-protection concept where required. [4]
Editorial calculation: at 1,000 t/h, discharging 60,000 t of wheat takes 60 h of net pumping, or 30 h with two 1,000 t/h lines; the rating is stated for wheat, so ask for the capacity on your own cargo and the clean-up method for the last part of each hold (NEUERO's 15 t auxiliary winch exists for that purpose). [4]
Compare that basis with Siwertell's statement that its screw unloader capacity depends on material, ship size and other factors, and write the cargo, bulk density, ship size and the clean-up share into the tender. [4] [1]
| NEUERO pneumatic unloader feature | Published value |
|---|---|
| Capacity per conveying line | Up to 1,000 t/h, based on wheat [4] |
| Rail-mounted tower, 2 conveying lines | Up to 2,000 t/h, based on wheat [4] |
| Auxiliary winch for lowering an excavator or front loader into the hatch | Up to 15 t lifting capacity [4] |
| Hatch coverage | Horizontal and vertical telescopic tubes; one version adds kick-in/kick-out of the vertical boom and a rotating milling cutter at the nozzle for poorly flowing materials such as grit or wood pellets [4] |
| Vessel range (kick-in/kick-out version) | Small barges to Panamax [4] |
04
Suppliers linked to this page list ship unloaders; each card links to the page reviewed.
Listings include pneumatic ship unloaders, mobile ship unloaders, grab-type and screw-type ship unloaders from a port-crane maker, ship unloaders from crane and trading companies, and ship unloader fabrication by an engineering firm. Ask each for principle, capacity on your cargo, vessel range, reach and environmental controls.
05
Port of Koper's 2018 technical specification for a 32 t grab-type ship unloader shows the limits a terminal can write into a tender. It asks for three-shift work (3 x 8 hour) at ambient -12 to +45°C, full operation in wind of 0 to 22 m/s, limited performance from 22 to 35 m/s, wheels in parking position from 35 to 44 m/s and stowed condition above 44 m/s. It sets a 32-tonne rated grab load, calculated to exceed hoisting capacity by 20% before overload protection acts, a maximum digging capacity of 2,000 tonnes/hour, a free digging capacity of 1,500 tonnes/hour and vessels up to 200,000 DWT, with design to F.E.M. 1.001 3rd edition, structure group A8 and hoisting and closing mechanisms classed T8 – L4 – M8. [3]
The same document caps noise at 70 dBA inside the operator cabin and 72 dBA inside the electric control room, and specifies a 105 m³ hopper holding up to 110 tonnes in normal operation with high-pressure water-fog dust suppression of at least 100 bar and 2 pumps. Its design cargoes are coal at 0,8 tonnes/m3 with lumps up to 50 mm and iron ore up to 2,5 tonnes/m3 with lumps up to 250 mm, and it asks for an anticorrosion coating of at least 250 μm dry film. [3]
For warranty and handover it asks for at least 2 years on mechanical and electrical components, 5 years on the steel structure and 10 years on anticorrosion protection, spare parts for at least 10 years, delivery fully erected, testing and acceptance within 1 month, and 15 working days of maintenance and operator training after acceptance. [3] Editorial note: this is one terminal's grab unloader for coal and ores; use its structure as a checklist and put in your own cargo, berth and climate values.
06
This is a functional reference built from the sources cited; it is not one maker's specification.
| Part | Role | Fix in the order |
|---|---|---|
| Intake (screw inlet, chain leg, nozzle or grab) | Digs or draws cargo. [1] [2] | Principle and wear parts. |
| Vertical conveyor or leg | Lifts cargo out of the hold. [2] | Capacity and suspension. |
| Horizontal arm or boom | Reaches over the ship. [1] [2] | Length, luffing, slewing. |
| Counterweight and luffing | Balance and boom movement. [1] | Winch or hydraulic luffing. |
| Travel gear | Rails, tyres, fixed. [1] | Mounting type. |
| Operator cabin and remote control | Control. [2] | Cabin and remote. |
| Dust and spillage control | Environment. [2] | System type. |
07
A ship unloader quotation needs values for your terminal. The table explains each field, gives published values where a reviewed source states them, and says what to obtain from the supplier.
| Field | What it means and published values | Ask the supplier for |
|---|---|---|
| Unloading capacity (t/h) | Examples: 100–2,500 t/h by model; 300–1,300 t/h. [1] [2] | Rated and average for your cargo. |
| Maximum ship size (DWT) | Examples: 5,000–200,000 dwt. [1] | Vessel range. |
| Boom length (m) | Examples: 20–32 m. [2] | Reach and under-rim reach. |
| Commodities | Free-flowing or various. [1] | Cargo list and properties. |
| Mounting | Rails, tyres, fixed, offshore. [1] | Type and wheel loads. |
| Power (kW) | Drives. | Installed power and energy per tonne. |
| Dust and noise | Regulatory trend. [2] | Emission values. |
| Operating temperature (°C) | Climate. | Range. |
08
Paste it into your enquiry below or into an email to a maker, then replace every bracket.
Cargo: [commodities; density; flow properties] Volume: [annual tonnes; required rate] Vessels: [DWT range; hatches; air draft] Berth: [quay, jetty or offshore; loads] Type: [screw; chain; pneumatic; grab] Environment: [dust; spillage; noise; food safety] Power: [supply; energy limits]
These companies list ship unloaders.
Lists grab-type and screw-type ship unloaders with port cranes.
Product scope checked 2026-10-11
Lists pneumatic ship unloaders for port terminals.
Product scope checked 2026-10-11
Lists mobile ship unloaders and truck unloaders.
Product scope checked 2026-10-11
Trading company listing ship unloaders and loaders.
Product scope checked 2026-10-11
Lists ship unloaders on a crane company site.
Product scope checked 2026-10-11
Engineering and fabrication company listing ship unloader fabrication.
Product scope checked 2026-10-11
Explore company information and manufacturing capabilities, then discuss the scope of your project with a relevant supplier.
Siwertell positions its C- and D-type screw unloaders for non-free-flowing, compact cargo needing high digging capability. [1]
Maker ranges run from about 100–300 t/h for small screw units to 500–2,500 t/h for large ones; Bühler's chain units run 300–1,300 t/h. [1] [2]
Bühler cites tighter dust, spillage, noise and food-safety rules. [2]
Port of Koper's 2018 specification for a 32 t grab unloader sets full operation in wind of 0 to 22 m/s, limited performance from 22 to 35 m/s, wheels in parking position from 35 to 44 m/s and stowed condition above 44 m/s. [3]
NEUERO lists up to 1,000 t/h of wheat per conveying line and up to 2,000 t/h on a rail-mounted tower with two lines. [4]
Sources checked 2026-10-11. Siwertell (screw unloaders), Bühler (chain unloaders) and NEUERO (pneumatic unloaders) are makers describing their own ranges and arguing for their own principles; their figures are examples, not limits for other makes. Port of Koper's tender specification shows the limits a terminal can set.