Energy storage converter (PCS)

Battery energy storage power conversion systems (PCS) · bidirectional charge and discharge, power rating against energy capacity and duration, AC versus DC round-trip efficiency, grid-following and grid-forming control, and the transformer and controls around the converter

An energy storage converter, or power conversion system (PCS), is the bidirectional inverter/charger that connects a battery's DC bus to the AC grid or a microgrid: it charges the battery from AC and discharges it back, controlling power, and in some modes voltage and frequency. Ask three things first: what power rating the PCS needs against the battery's energy and duration, what efficiency it achieves AC-to-AC at the point of interconnection, and whether it must follow the grid or form it.

Bidirectional power conversion systems for battery energy storage in commercial, industrial and utility applications, including modular PCS cabinets, central PCS and inverter step-up skids. Solar PV inverters (a separate product page), EV chargers, battery cells and racks, and UPS systems are outside this page except where compared.

CNFX editorial research · Sources checked October 12, 2026 · 4 sources

Energy Storage Converter (PCS) in a manufacturing environment
Representative product image. Confirm appearance and specifications with the manufacturer.

01

Size the PCS against energy and duration

NREL's Grid-Scale Battery Storage FAQ defines rated power capacity as the total possible instantaneous discharge capability of the battery energy storage system (BESS) in kW or MW, energy capacity as the maximum stored energy in kWh or MWh, and storage duration as the time it can discharge at its power capacity before depleting its energy: 1 MW of power with 4 MWh of usable energy gives four hours. Round-trip efficiency is the ratio of energy discharged to energy charged and can be stated DC-DC or AC-AC; in NREL's words, "although battery manufacturers often refer to the DC-DC efficiency, AC-AC efficiency is typically more important to utilities", which see the battery only at the AC point of interconnection. Its diagram shows the batteries connected through an inverter/charger and a step-up transformer to the grid. [1]

Editorial calculation: a 500 kWh usable battery meant to discharge over two hours needs a PCS of about 500 / 2 = 250 kW. If the PCS converts at 97% in each direction, its own losses alone cut AC-to-AC round-trip efficiency to 0.97 × 0.97 ≈ 94% of the DC round-trip value, before transformer and auxiliary losses. The battery size, duration and 97% figure are assumed examples; ask for the PCS efficiency curve and the measured AC-AC round-trip efficiency of the complete system.

A utility-scale PCS data sheet shows the ratings behind those definitions. SMA's Sunny Central Storage UP data sheet lists the SCS 3600 UP at 3,620 kW nominal AC power at 1,200 V DC and unity power factor, with apparent power derating from 3,620 kVA at 25 °C to 3,290 kVA at 40 °C and 3,075 kVA at 50 °C, a 921–1,500 V DC operating window, 4,750 A maximum DC current, 630 V nominal AC (504–756 V), total harmonic distortion below 3% at nominal power, a minimum short-circuit ratio above 2 at the AC terminals, and 98.8% maximum efficiency. It weighs under 3,700 kg in a 2,815 × 2,318 × 1,588 mm enclosure (IP54 electronics), draws under 8,100 W maximum and under 370 W on standby for its own consumption, and operates from −25 to 60 °C (−40 °C optional) up to 1,000 m (2,000 m optional). Grid forming, current boost and black start are listed as options. [3]

Editorial calculation: at 98.8% one-way efficiency a charge-discharge cycle through the PCS alone loses about 2.4% (1 − 0.988²), before battery and transformer losses; and the derating from 3,620 to 3,075 kVA means a site at 50 °C gets about 85% of the 25 °C rating (3,075 ÷ 3,620), so size the PCS at the site's design temperature. [3]

Installed US systems show how far the power-to-energy ratio varies by use. The US Energy Information Administration's report Battery Storage in the United States: An Update on Market Trends (August 2021) defines duration as nameplate energy divided by nameplate power and groups systems as short (under 0.5 h), medium (0.5–2.0 h) and long (over 2.0 h). In 2019, PJM installations serving frequency regulation averaged 10.8 MW, 6.8 MWh and 45 minutes, while CAISO installations used for reliability averaged 4.7 MW, 14.4 MWh and 4.0 hours; US large-scale battery power capacity reached 1,022 MW and 1,688 MWh, and average energy-storage capital cost was $589 per kWh in 2019 after a 72% fall from 2015. [4] Editorial calculation: at 45 minutes the PCS rating is the larger cost driver, at 4 hours the battery is; a 3,600 kW PCS like the SMA unit above would pair with about 2.7 MWh for a PJM-style 45-minute system or 14.4 MWh for a CAISO-style 4-hour one, so state the duration before asking for PCS quotations. [4] [3]

Give the supplier the battery chemistry, DC voltage range and usable energy, required AC power (charge and discharge), grid voltage and frequency, transformer arrangement, control modes (grid-following, grid-forming, black start, off-grid), required grid code and certifications for your market, communication with the battery management system and plant controller, cooling, enclosure and IP rating, ambient conditions, and warranty and service.

02

Choose grid-following or grid-forming control

NREL's research roadmap on grid-forming inverters recognises that "inverter controls today are predominantly grid-following" and that future power systems will mix grid-following and grid-forming controls. In its functional diagrams, grid-following inverters mimic current sources at their output terminals, whereas grid-forming inverters act like voltage sources whose output follows droop laws; future systems will have a significant fraction of inverter-based generation, unlike today's grids dominated by machines with large rotational inertia. [2]

Editorial note: if the storage must run a microgrid, ride through weak-grid conditions or provide black start, ask whether the PCS supports grid-forming operation, how it transitions between modes, and which grid-code tests it has passed in that mode.

03

Compare what suppliers offer

Suppliers linked to this page list energy storage converters; each card links to the page reviewed.

Listings include ranges of energy storage converters from modular cabinets to central units and inverter step-up skids, and PCS units offered with transformers, switchgear and containerised storage systems. Ask each for power ratings, DC voltage window, efficiency curve, control modes and certifications.

04

Trace the system around the PCS

This is a functional reference built from the sources cited; it is not one maker's specification.

ElementRoleFix in the order
Battery (DC)Stores energy; sets kWh. [1]Voltage window; usable kWh.
PCS (inverter/charger)Bidirectional DC–AC conversion. [1]Power; efficiency; modes.
Step-up transformerConnects to grid voltage. [1]Rating; vector group.
ControlsFollowing or forming behaviour. [2]Modes and grid code.
Point of interconnectionWhere AC-AC efficiency is seen. [1]Metering point.

05

Fill the specification fields with values for your project

A PCS quotation needs values for your project. The table explains each field, gives published values where a reviewed source states them, and says what to obtain from the supplier.

FieldWhat it means and published valuesAsk the supplier for
Rated powerInstantaneous kW/MW capability; e.g. 3,620 kW, derated to 3,075 kVA at 50 °C. [1] [3]Charge and discharge rating.
Duration matchExample: 1 MW with 4 MWh = 4 h; US averages 45 min (PJM) to 4.0 h (CAISO) in 2019. [1] [4]Fit to battery energy.
EfficiencyAC-AC matters to utilities; e.g. 98.8% max PCS efficiency. [1] [3]Efficiency curve; AC-AC RTE.
Control modeGrid-following or grid-forming; grid forming offered as an option on one PCS. [2] [3]Modes supported.
Grid connectionThrough transformer; e.g. 630 V AC (504–756 V), SCR > 2. [1] [3]Voltage; transformer.
CertificationsGrid code for your market; e.g. IEC/EN 62109-1/-2, AR-N 4110/4120. [3]Test reports.

06

Send the battery, grid and control data together

Paste it into your enquiry below or into an email to a maker, then replace every bracket.

Battery: [chemistry; DC voltage range; usable kWh]
Power: [charge kW; discharge kW; duration]
Grid: [voltage; frequency; transformer; grid code]
Control: [grid-following; grid-forming; black start; off-grid]
Integration: [BMS; EMS/plant controller protocols]
Site: [cooling; enclosure; ambient; altitude]

See manufacturer records Send an enquiry through CNFX

Compare energy storage converter suppliers

These companies list energy storage converters (PCS).

Shenzhen Sinexcel Electric Co., Ltd.
Manufacturing site to be confirmed for the order

Lists a range of energy storage converters (PWS/PWX series) and inverter step-up skids.

Product scope checked 2026-10-11

Current product source ↗

Energy storage converters listed · profile compiled by CNFX from public sources
TSTY Electric Co., Ltd.
Manufacturing site to be confirmed for the order

Lists PCS energy storage converters with transformers, switchgear and energy storage systems.

Product scope checked 2026-10-11

Current product source ↗

PCS listed · profile compiled by CNFX from public sources

Explore company information and manufacturing capabilities, then discuss the scope of your project with a relevant supplier.

Buyer questions

How do I size a PCS for a battery?

NREL relates power, energy and duration: 1 MW with 4 MWh of usable energy runs four hours; size the PCS for the power you need over the required duration. [1]

Which round-trip efficiency should I compare?

NREL writes that "AC-AC efficiency is typically more important to utilities" than the DC-DC figure, because utilities see the battery at the point of interconnection. [1]

What is a grid-forming PCS?

NREL describes grid-forming inverters as acting like voltage sources whose output follows droop laws, unlike grid-following inverters that mimic current sources. [2]

How much does a utility-scale PCS derate with temperature?

SMA's data sheet lists the SCS 3600 UP at 3,620 kVA at 25 °C, 3,290 kVA at 40 °C and 3,075 kVA at 50 °C, with 98.8% maximum efficiency. [3]

How many hours of storage do US grid batteries have?

US EIA data for 2019 show regional averages from 45 minutes (PJM, frequency regulation) to 4.0 hours (CAISO, reliability); EIA classes durations as under 0.5 h, 0.5–2 h and over 2 h. [4]

Sources and what still needs a direct check

Sources checked 2026-10-12. Both sources are US National Renewable Energy Laboratory publications (cited from Internet Archive copies because nrel.gov did not respond); the grid-forming roadmap was written with other US national laboratories and universities.

  1. NREL / USAID Greening the Grid — Grid-Scale Battery Storage: Frequently Asked Questions (NREL/TP-6A20-74426, Internet Archive copy) ↗ National laboratory fact sheet Return to text ↑
  2. NREL — Research Roadmap on Grid-Forming Inverters (NREL/TP-5D00-73476, Internet Archive copy) ↗ National laboratory technical report Return to text ↑
  3. SMA Solar Technology — Sunny Central Storage UP (SCS 3450/3600/3800/3950 UP) data sheet, SCS-UP-DS-en-23 ↗ Maker data sheet Return to text ↑
  4. US Energy Information Administration — Battery Storage in the United States: An Update on Market Trends (August 2021) ↗ Government statistics Return to text ↑

Still to check yourself

  • Match PCS power to battery energy and duration.
  • Compare AC-AC round-trip efficiency.
  • Confirm control modes and grid code.
  • Check BMS and plant controller integration.
  • Verify the legal supplier and factory.
Buyer enquiry

Request manufacturing insight for Energy Storage Converter (PCS)

Ask for use case, specification boundaries, supplier type, and RFQ preparation information for this product.

Where it goes
Straight to the CNFX editorial desk, and to the manufacturer if this product is linked to a claimed profile. Nothing is broadcast to a supplier list.
Your details stay here
We do not sell or rent enquiry data, and we do not add you to a mailing list. Used only to answer this request.
No commission, no middleman
CNFX is a directory. We take no cut of any order and never negotiate on a supplier's behalf.
What to include
Share your product specifications, quantity, destination and target delivery date.

Your business information is used only to process this request.

Thank you! Your message has been sent. We'll respond within 1–3 business days.
Sorry, we couldn't send your message. Please try again, or email us at [email protected].

Need to Manufacture Energy Storage Converter (PCS)?

Compare manufacturer profiles with relevant product and process capability.

Previous Product
Wire Tensioning System
Last Product
Get QuotesChat